L.E.B.S. Electric renovated an existing Cath Lab at HCA Florida Trinity Hospital, upgrading it to meet current code receptacle power requirements. During the Cath Lab upgrade, we ensured the shared control room remained fully operational, allowing hospital staff to continue providing life-saving procedures in the second Cath Lab without disruption.
By working together with PHM group serving as the general contractor, the team evaluated upcoming needs and client goals early in the project, allowing critical infrastructure to be installed at the front end of the project. This proactive approach helps reduce future costs, limits downtime, and ensures the space is prepared to support advancing medical technology for years to come. GE Healthcare served as the equipment vendor, helping deliver a truly future-ready procedure room.
Stay tuned for a close look at the second procedure room that was renovated by our team, both being a part of an overall replacement of 5 total rooms with more phases to come.
More updates to follow as this important healthcare space project continues.