Skip to main content

Supporting Florida’s Healthcare Facilities as a Proud FHEA Member

L.E.B.S. Electric is a member of the Florida Healthcare Engineering Association and we take great pride in delivering electrical services for public works projects and healthcare facilities across Florida, including hospitals, VA facilities, medical offices, urgent care centers, and assisted living and memory care communities. 

We look forward to continuing as a trusted partner for Florida’s healthcare engineers and professionals.

Celebrating Our Staff with February Work Anniversaries

This month we’re celebrating the dedication, skill, and hustle of our LEBS Electric team with February work anniversaries. From our talented electricians in the field to the hardworking staff in our offices, these milestones represent the people who contribute to our success every single day. 

Thank you for the commitment, pride, and professionalism you bring to every job and to our company. We couldn’t do it without you.

Delivering a new MRI Suite and other Healthcare Upgrades at HCA Florida Largo Hospital

Our team is always committed to making a lasting impact on healthcare across Florida, and our work at HCA Florida’s Largo Regional Hospital is no exception.

In collaboration with James E. Toth (JET) Architecture, ICT Inc., and GE Healthcare, we delivered a new MRI suite within the first-floor radiology department, along with dedicated ancillary spaces for staff, including offices, a break room, and restroom facilities.

The project also included upgrades to an existing CT scan holding area and the replacement of the RTU serving the suite and surrounding spaces, enhancing both functionality and comfort throughout the department.

Enhancing Patient Care and Surgical Capabilities

L.E.B.S. Electric is proud to support BayCare Healthcare System with critical electrical infrastructure that enhances patient care and surgical capabilities.

For this project at Winter Haven Hospital, our team provided power for a Stryker boom system within an active operating room. This upgrade allows additional medical equipment to be seamlessly integrated, giving surgical teams greater flexibility and enabling a broader range of services for patients.

Our team worked closely with Cork-Howard Construction as General Contractor, Studio Architecture as Architect, and BSA as MEP Engineer. The operating room suite remained fully operational throughout the project and all work was strategically completed at night, ensuring zero disruption to scheduled surgeries, staff workflows, or patient care.

Projects like this require and demand coordination, adaptability, and respect for the critical nature of medical facilities. We’re proud to deliver solutions that make a meaningful difference where it matters most.

Another ALDI comes to Bradenton with L.E.B.S. Electric’s Craftsmanship

Another ALDI grocery store location is coming to Bradenton. 

L.E.B.S. Electric served as the project’s MEP Engineer, partnering with DeAngelis Diamond and Interplan LLC on the retrofit of an existing Winn-Dixie.

The 43,000 sq. ft. building includes 22,000 sq. ft. dedicated to ALDI, with the remaining space reserved for future tenants. Different from other projects, this building presented a unique challenge with a large central arch within the structure. Our team’s craftsmanship allowed for this project to come to life seamlessly. 

Team Building, Friendly Competition, and a Big Win at Topgolf Event

L.E.B.S. Electric recently hosted a team-building event at Top Golf Tampa for our West Coast foremen, bringing everyone together to connect, unwind, and have some fun. With great food, mini games, and friendly bragging-rights competitions, it was a day full of laughs and camaraderie.

A special thank you to our partners Graybar Sarasota and CED Orlando for providing the gifts that made the event even more memorable.

Congratulations to Steve Foss, our grand prize winner, who took home the big screen TV after winning the Longest Drive competition! 

Proud of our team and grateful for the partnerships that help make moments like this possible.

L.E.B.S. Electric: The Company Businesses Trust to Keep Florida Moving

As a Supporting Partner sponsor, L.E.B.S. Electric had the opportunity to air a company video during the Echo Power Conference at the Embassy Suites by Hilton Nashville Downtown.

Watch our latest company video to learn more about how across Florida, every connection, every system, and every moment begins with the expertise of our teams at L.E.B.S. Electric. 

We specialize in commercial and industrial electrical services, delivered by a team of dedicated professionals committed to the highest standards of quality workmanship, safety, and customer care.

Part 2: HCA FL Trinity Hospital Nuclear Medicine Expansion

Part 2 of the first phase of our work at HCA Florida Trinity Hospital involved the renovation and expansion of a Nuclear Medicine procedure room. 

L.E.B.S. Electric is grateful to be a part of delivering premier medical imaging services to the community and supporting research, diagnosis, and life-saving treatment.

This specialized Nuclear Medicine space supports advanced diagnostic imaging using tracer materials and gamma camera technology, allowing Trinity Hospital staff to perform critical scans of the bones, breasts, gallbladder, heart, and thyroid.

This milestone marks the second completed procedure room in a five-room total replacement project, completed in collaboration with PHM Group as General Contractor and GE Healthcare as the equipment vendor.

And we’re not slowing down.
🔹 Phase 2 is well underway with the renovation of an existing CT Scan
🔹 Phase 3 will unveil a second Cath Lab
🔹 The final phase is an Angio Bi-Plane renovation and something you won’t want to miss

At L.E.B.S. Electric, we’re energized to support healthcare environments where precision, reliability, and innovation matter most. Stay tuned.

Phase 1, Part 1 at HCA Florida Trinity Hospital Renovates Cath Lab, Delivering Future-Ready Procedure Room

L.E.B.S. Electric renovated an existing Cath Lab at HCA Florida Trinity Hospital, upgrading it to meet current code receptacle power requirements. During the Cath Lab upgrade, we ensured the shared control room remained fully operational, allowing hospital staff to continue providing life-saving procedures in the second Cath Lab without disruption.

By working together with PHM group serving as the general contractor, the team evaluated upcoming needs and client goals early in the project, allowing critical infrastructure to be installed at the front end of the project. This proactive approach helps reduce future costs, limits downtime, and ensures the space is prepared to support advancing medical technology for years to come. GE Healthcare served as the equipment vendor, helping deliver a truly future-ready procedure room.

Stay tuned for a close look at the second procedure room that was renovated by our team, both being a part of an overall replacement of 5 total rooms with more phases to come. 

More updates to follow as this important healthcare space project continues.