Skip to main content

Powering Curry Commerce Center in Babcock Ranch, Florida

See the transformation of Curry Commerce Center, Babcock Ranch’s newest commercial and industrial development in America’s first solar-powered town.

This 255,000-square-foot, eight-building flex and light industrial complex offers space for a wide range of businesses, including offices, showrooms, warehouses, service providers, distributors, trade professionals and light manufacturers.

L.E.B.S. Electric worked with Kitson & Partners and J. Raymond Construction Corporation on this exciting project, also collaborating with Center for Innovative Structures, WHA Design and EPG Engineering, Inc. to help bring the development to life.

Watch the video to see the project come together.


L.E.B.S. Electric Powers Major AdventHealth Sebring Expansion and the Future of Patient Care

Our L.E.B.S. Electric team recently completed extensive work on the AdventHealth Sebring Tower Expansion (AHSTE), a major project designed to strengthen the hospital today and prepare it for continued growth.

The expansion includes a three-story addition to the existing bed tower, with one floor fully built out and two additional floors planned for the future. Our work also included a major addition to the existing Central Energy Plant, two new 2-megawatt generators, and a new utility service.

A permanent power system was necessary for a mobile MRI unit, new generators were integrated to replace the existing generator systems and capture the old Emergency Distribution Plant into a new design, and we installed a new fire alarm system throughout the entire building.

Projects of this size and complexity take tremendous planning, coordination and craftsmanship. We’re proud to work with AdventHealth, Brassfield & Gorrie, and TLC Engineers to expand patient care in Sebring. 

But wait, there’s more. Stay tuned for the next phases that will add more than 100,000 square feet of new clinical space, advancing the technology used to diagnose and treat heart disease and expand the hospital’s capacity, transforming Sebring Hospital from 171 to 275 inpatient beds.

Renovating an Interventional Radiology Suite and Healthcare Space at BayCare Mease Countryside Hospital

At BayCare Mease Countryside Hospital in Safety Harbor, we completed the electrical work for the full renovation of an Interventional Radiology (IR) suite. The project included the complete demolition of the existing IR room and equipment room, a partial remodel of the control room, and the installation of new Siemens imaging equipment to help support advanced patient care.

We’re proud to have partnered with The Terbo Group, Studio S Architecture, Emerald Engineering, and Beckley Engineering Consultants to bring this modernized space to life.

Thank you to everyone involved for another successful healthcare project. Every renovation like this helps provide medical professionals with the technology they need to deliver outstanding care to their patients.

Transforming Former Nuc Med Rooms into Modern CT Scan Space and Updated Hot Lab at HCA Doctors Hospital of Sarasota

Another healthcare project completed by our team. L.E.B.S. Electric recently renovated two former nuclear medicine rooms and a hot lab at HCA Doctors Hospital of Sarasota, transforming the space into a modern CT scan room, new control room, and updated hot lab featuring new equipment from GE Healthcare.

Projects like these take strong teamwork, and we’re proud to have partnered with Wehr Constructors, TMP Partners, and ICT, a Salas O’Brien Company to help deliver another upgraded healthcare facility that will better serve patients and medical professionals.

Great work by everyone involved.

Celebrating Our Staff with July Work Anniversaries

Cheers to our July Work Anniversary Celebrations! Every year of service tells a story of hard work, growth, and a commitment to doing the job right. This month, we’re proud to recognize the team members celebrating another year with L.E.B.S. Electric.

Your dedication, craftsmanship, and willingness to go the extra mile help power the projects we take on and the reputation we’ve built across Florida. We truly appreciate everything you bring to the team, and we’re grateful you’ve chosen to grow your career with us.

Congratulations, and here’s to the road ahead and many more milestones together.

Renovating Procedure Room with Advanced Imaging at HCA Florida Largo West Hospital

L.E.B.S. Electric helped enhance healthcare services at HCA Florida Largo West working alongside The PHM Group, Inc., Orozco Architecture, JMS Engineering, and DCL Engineering.

Our team supported the remodeling and renovation of the existing procedure room and associated ancillary spaces, including equipment storage, the control room, and ante room.

The project involved replacing the existing X-ray room with state-of-the-art CT scan equipment from GE Healthcare, creating an upgraded environment designed to support advanced diagnostic imaging and patient care.

We appreciate the opportunity to partner with such a talented project team and contribute to a facility that will help healthcare professionals continue delivering exceptional care to the community.

Honoring and Serving Those Who Have Served Us as OPS Golf Outing Sponsor

L.E.B.S. Electric was honored to serve as an Overwatch Commander Sponsor for Operation Patriot Support’s 5th Annual Golf Tournament.

We are proud to stand alongside this incredible organization and support its mission of serving those who have served us. Operation Patriot Support is dedicated to assisting Gold Star families, veterans, law enforcement officers, first responders, and their families who have been wounded, injured, or are otherwise in need throughout the west central Florida region.

Events like this remind us of the importance of giving back to the heroes in our communities and ensuring they have the support they deserve.

Central Florida Team Members Come Together for Training and Certification

Our Central Florida team recently gathered at the Orange County Bar Association building for a day of training and certification with Wishart Safety Training.

More than 60 employees serving the Kissimmee and greater Orlando communities completed CPR, AED, and Bloodborne Pathogens certification courses, gaining valuable skills that can make a difference in an emergency.

We’re proud of our team’s commitment to safety and preparedness, ensuring they’re equipped to respond when it matters most.

Renovating Endoscopy Suites, Nurse Station and Patient Spaces at St. Pete’s Hospital

Our team’s work was on full display as we renovated 2 endoscopy suites, nurse station, ancillary spaces and patient holding bays at HCA Florida St. Petersburg Hospital with the addition of all new HVAC equipment to serve the renovated space. We shutdown critical existing systems after hours so we could carefully and successfully execute the installation of new panels and upgrades without disrupting hospital operations. 

It’s always a pleasure to work with J2 Solutions, Inc, James E. Toth Architecture, ICT and McElroy Engineering to bring this healthcare project to life.