LEBS Electric recently completed a project at AdventHealth’s East Orlando campus including the installation of three new 2MW generators with provisions for a future fourth plus a new building housing the Emergency Distribution Equipment (EDP) and all associated power systems. Our team also delivered a completely new network control system for the facility’s 27 existing ATS units, strengthening reliability across the entire campus.
In the photos, you’ll see the impressive 450-ton Sims crane setting two new 2MW Ring Power generators along with two fuel day tanks. The Sims Rigging team skillfully received the generators and tanks and pulled them into place once the crane got them partially into the building. The entire operation was completed in less than six hours, all while the hospital maintained full operational capacity.
We’re grateful for the collaboration with Brasfield & Gorrie (General Contractor) and TLC Engineering (Engineer). Together, we’re building the resilient, dependable power systems that keep healthcare facilities ready when it matters most.