Skip to main content

Transforming Existing Suites into New Fluoroscopy Space in Dunedin

Keeping patient care moving forward is always our priority when our team is working at one of Florida’s healthcare facilities.

Our team recently transformed the existing X-ray suites into a new fluoroscopy space at BayCare Mease Dunedin Hospital.

Our scope included the demolition of the existing X-ray suites and the installation of electrical work supporting the new procedure room, control room, equipment room, equipment alcove, and patient toilet room.

Healthcare projects require careful planning, coordination, and attention to detail to ensure every part of the space is ready to support the medical teams and patients who depend on it.

We’re proud of our team’s work and grateful to work alongside Ranon as the general contractor, Studio S Architecture Associates as the architect, KBA Engineering, Inc. as the engineering team, and CMS Imaging, Inc. as the equipment vendor. Strong partnerships like these help bring complex healthcare projects together.

Keeping Critical Care Moving with Cath Lab Renovation at AdventHealth Zephyrhills

We recently completed another healthcare project focused on keeping critical care moving forward!

The L.E.B.S. Electric team renovated the existing Cath Lab #3 at AdventHealth Zephyrhills, including the control room and equipment space, with the installation of new Philips Azurion 7 imaging equipment.

Located on the second floor, the project required careful coordination and after-hours work to ensure the imaging space below could continue operating without disruption to patient care. That’s what it takes to get the job done right while keeping patients and hospital operations a priority.

Thank you to our project partners, Robins & Morton, RLF (Rogers, Lovelock + Fritz, Inc.), and Philips, for helping bring this project together

Drone Look at AdventHealth Sebring’s Massive Hospital Expansion 

Every great healthcare expansion starts with the infrastructure that powers it. Take an aerial look at the incredible progress on the AdventHealth Sebring Tower Expansion, where the L.E.B.S. Electric team is proud to provide the electrical systems supporting one of the region’s most significant healthcare projects.

This expansion includes:
• A new three-story patient tower addition, with one floor completed and two additional floors planned for future growth.
• A major expansion of the Central Energy Plant.
• Installation of two new 2-megawatt emergency generators.
• A new utility service.
• Permanent power infrastructure for a mobile MRI unit.
• Integration of new emergency power systems while transitioning the existing Emergency Distribution Plant into a new design.
• A new fire alarm system throughout the facility.

Projects of this scale require exceptional planning, coordination, safety, and craftsmanship. We’re honored to work alongside AdventHealth, Brasfield & Gorrie, and TLC Engineering Solutions to help transform Sebring Hospital from 171 to 275 inpatient beds, expanding access to quality healthcare for the community for years to come.

Learn more about L.E.B.S. Electric by subscribing to our YouTube channel @LEBSElectric.

 

Replacing CT Scan Equipment and Installing Large UPS to Protect Critical Healthcare Equipment

L.E.B.S. Electric delivered a healthcare infrastructure upgrade at HCA Florida Northside Hospital. This project involved a 1-for-1 replacement of existing CT scan equipment with new state-of-the-art Philips Healthcare machinery, ensuring the facility remains on the cutting edge of patient imaging.

To enhance system reliability, we also installed a large UPS (Uninterruptible Power Supply) to protect critical equipment during power outages until a more permanent solution like a generator kicks in. 

We partnered with J2 Solutions (General Contractor), Orozco Architecture, Inc. (Architect) and I.C. Thomasson Associates, Inc. (Engineer) to provide this backup power system.